Lighting Profile Manufacturing
PC extrusion, PMMA extrusion, co-extrusion, tooling, prototyping, production, cutting, inspection and packing – the capability behind the profiles we supply.
Capability
| PC extrusion | Polycarbonate profiles for impact- and heat-critical lighting parts |
|---|---|
| PMMA extrusion | Acrylic profiles for high-transmission diffusers, lenses and covers |
| Single-colour extrusion | One material, one colour, in clear, opal or matched colours |
| Two-colour extrusion | Co-extrusion combining two materials or colours in one section |
| Tooling | Die and calibration tooling designed and machined in-house |
| Prototype | First-off sections for approval before volume production |
| Mass production | Matched extrusion lines for repeat and volume orders |
| Cutting | Cut to length, drilling, notching and machining to your drawing |
| Inspection | Dimension, appearance and optical checks before release |
| Packaging | Protective film, bundles, cartons and labelling to your specification |
We publish what we actually run. Capacity figures depend on the section, the material and the quantity, so we confirm them for your project when we quote rather than quoting a number that may not hold for your profile.
What we work to
| Production lines | 20+ extrusion and co-extrusion lines |
|---|---|
| Section width | up to 400 mm across the profile |
| Critical die dimensions | ±0.1 mm on the dimensions that carry the fit |
| Transmittance | 0-97%, measured and matched to target |
| Colour | 100+ shades matched to RAL or Pantone |
| Process monitoring | MES record, with sampling at intervals through the run |
| Retained samples | a sample from each batch is kept for comparison |
| Minimum order | from 500 pcs per profile |
| Sample to mass production | around 6 weeks, tooling included |
Capacity is not the interesting number. Consistency is – a profile that matches the one you approved two years ago matters more than how many metres a line can push in a shift.
What repeatability actually requires
Any extrusion line can produce a good first metre. The difficult part is producing the same profile on the ten-thousandth metre, and again on a re-order two years later. That is a process-control problem rather than a capacity problem, and it is where most of the work on this floor goes.
Three things move a profile during a run: melt temperature, line speed and die condition. All three are monitored, and samples are taken at intervals through production rather than only at the start. A sample from each batch is retained, which is what allows a later order to be matched to the original rather than to a fresh mix.
Co-extrusion adds a fourth variable. Two melt streams have to stay bonded through cooling and haul-off, so the process window is narrower and the first-off check is longer. It is also the capability that lets us put material only where it does work – an optical face, a UV cap, or an opaque body – in a single pass.
Traceability closes the loop. Production runs are recorded under the MES, and retained samples are kept against that record. If a question comes up about a batch months later, there is something to measure rather than an argument to have.
What to put on the drawing
- Section at 1:1 with wall thickness dimensioned separately
- Which dimensions carry the fit – mark them
- Transmittance target as a number at the running wall thickness
- Colour reference, and whether a retained sample is required
- Annual volume – it sets run length and die maintenance intervals
- Cut length, packing and target date
Where consistency breaks down
Four causes account for most of the variation seen between batches, and all four are process variables rather than material faults.
Melt temperature drift
Running hot degrades the resin on the way out, and the colour is already in the profile at take-off. Temperature is monitored, not assumed.
Line speed changed to hit a date
Speed affects cooling and therefore dimensions. A profile run fast at the end of a shift is not the profile that was approved.
Die wear on optical geometry
Prism and lenticular detail is the first thing a die loses. Long runs need a planned maintenance interval.
Re-order mixed without a reference
Without a retained sample, a repeat order is a fresh mix. On a ceiling with two batches side by side, the difference is visible.
None of these are visible on a certificate. They are visible on a retained sample measured against the production record, which is why we keep both.
Quality system
- ISO 9001:2015 certified quality management system
- Incoming material control through to finished-part release
- Dimension and appearance inspection against the agreed drawing
- Optical checks - transmittance and diffusion - against your target
- Colour controlled between batches for continuous and phased projects
- Protective packing so optical surfaces arrive clean and unmarked
Certification
Documents we hold, and send with a quotation when your approval process needs them:
- ISO 9001:2015 – certificate 00124Q34175R1S/3300 issued by CQC, valid to 16 May 2027
- UL 94 – V-0 from 1.0 mm and V-2 down to 0.40 mm on the polycarbonate grades we extrude, per the UL component plastics cards
- RoHS – SGS test report on PC profiles
- PAH statement – Bayer MaterialScience compliance certificate for the compounds
Frequently Asked Questions
Send us your drawing or sample
Or email your drawing to info@leddiffuserfactory.com · WhatsApp +37259205909 · WeChat +8615867897761